UNITED PIPELINE SYSTEMS INC
Active
Monitor this licenseFree plan: up to 5 licenses. Paid plans cover additional licenses. Sign in to activate instantly, or confirm by email.
LicenseCurrent is an independent service. Nevada active contractor directory snapshot captured October 27, 2026. Some active records include past expiration dates; confirm current standing with the Board. Inactive licenses are not included. Updates are manual with no set schedule; monitoring alerts depend on a new snapshot being imported. Verify with Nevada State Contractors Board.
0090737
Active
—
2027-06-30
DURANGO, CO 81303
—
- — A-19 Pipeline and Conduits
DURANGO CO 81303
Unlimited
LIMITED TO INSTALLATION OF THERMOPLASTIC INTERNAL PIPELINE LINING SYSTEM IN EXISTING PIPES, NOT INCLUDING EXCAVATION, TRENCHING, BORING, OR BACK FILLING.
Missing fields mean not supplied in this source, not uninsured or noncompliant.
No personnel loaded.
Last seen in successful import (UTC): 2026-10-28 00:01:02.
